NATURE OF JOB
Clean-Up and remediation of crude oil impacted site (12NOs) communities in gbaramatu kingdom
(IKPOKPO, OTO-GBENE ATANNBA, OKPELA-AMA, TEBUJOR, MEKE-AMA, OKERENKOKO-GBENE, OPUEDE, OPUEDE-ZION, OPUEDEBULOR, GIAMA-ZION & OPOROZA.)
Sectional replacement of leaking spot on the 24" ELPS-1 gas pipeline at KP28, near Odidi central node in Delta state
The Emergency Sludge Removal and Remediation of Tank 101 Bundwall at Escravos Terminal, Delta State
Leak Repairs and Sectional Replacement of 24’’ CWC Gas pipeline from Warri-Ajaokuta-Oben Segment (KP127)
Leak Repairs and Sectional Replacement of EPL’s Phase 1Gas pipeline 24” from Warri-Escravos (KP11,19,23,39)
192x134/150x100m/10m dept Carnal Creation and Dredging at Obitugbo/Adjagbodudu – Koko Warri North LGA Delta State for Awaritse Nigeria Limited
10.7km 6’’ Gas Line Replacement with 10’’ at Ologbo-Ovade for AMPS/NPDC
27km 6’’ Crude Line Replacement with 10’’ at Ologbo-Ovade for AMPS/NPDC
3km 16’’ Gas line Replacement from Abiteye (flow Station) to Escravos, CNL (EGL)
20” Amukpe-Escravos Pipeline Installation, Benikrukru (January 26th – March 15th, 2012)
PPMC “24” Crude Oil pipeline Leak Repair Escravos-Warri at Egwa 1I (Dec 15th – Dec 20th , 2011)
PPMC “24” Crude Oil pipeline Leak Repair Escravos-Warri at Ibafan Creek Creek(July 11th – July 19th, 2011)
PPMC “24” Crude Oil pipeline Leak Repair Escravos-Warri at Ibafan Creek (June 3rd - June 11th , 2011)
Provision of 40 man Houseboat
Supply of AGO to Globestar Engineering Company Nigeria Limited “BU 6286.5069-Aawrd No. FA-NI-2011-003”